Canyon Regional Water Authority

Wells Ranch Project


            

CRWA

CRWA has acquired from Bexar Metropolitan Water District the responsibility to develop the Wells Ranch Project located in Guadalupe and Gonzales Counties.  The Phase I project is designed to provide an additional 5200 acre feet of water to be supplied to Bexar Met, East Central SUD, Green Valley SUD, City of Cibolo, City of Marion, Springs Hill WSC and Crystal Clear WSC.  The project is comprised of seven wells drilled into the Carrizo Aquifer drilled on the Wells Ranch along with a well collection system and treatment facility.  In addition 12 miles of water transmission line and the Leissner Road Booster station is included in the project.  The project is funded by 54 million dollars worth of bonds sold as tax exempt public issue.

 

Construction has begun and all wells are in place and being tested.  The majority of the collection system is in place and in final phase.  Layne Texas is the well drilling contractor and the collection system is being constructed by Hollman Construction.  The transmission line is awarded to Garney Construction Company.  Leissner Road Booster Station is in construction and awarded to Payton Construction.  The Leissner Road Booster Station is comprised of a two million gallon per day storage tank and booster pumps.  The station will pump to the 1518 elevated tank located at 1518 and IH 10.


 Well Drillings8001172

.