Reedville Pipeline Project

Reedville Pipeline The contractor has installed 3930 LF of 12″ C909 pipe.

Hays Caldwell Phase 1 Improvements

Hays Caldwell Phase 1 Improvements The inspector was at the Tank Site, and all of the 24-inch piping has been connected to the new penetration fittings (top and bottom sidewall) at the Old GST.  Each pipe segment has been filled with water and will undergo a 24-hr. static leakage test.

Hays Caldwell Phase 2 Improvements

Hays Caldwell Improvements Phase 2 The GC is currently installing the ductile iron pipe at the east end of the electrical and mechanical building. The building subcontractor will be erecting scaffolding and working on roof finishing and waterproofing for the next 4 weeks.