Wells Ranch II Emergency Generator All pads have been poured with backfill and clean up in progress, work to resume in March pending the electrical gear delivery
The contractor has completed the temporary pipe supports excluding the large column pipe support. The contractor has started demolishing the existing concrete for the column pipe support. The upcoming work is to install the HDPE and Fabricated HDPE piping for the temporary system. Once the piping is installed, the contractor will begin installing the temporary…
Reedville Pipeline The contractor has installed 3930 LF of 12″ C909 pipe.
Hays Caldwell Phase 1 Improvements The inspector was at the Tank Site, and all of the 24-inch piping has been connected to the new penetration fittings (top and bottom sidewall) at the Old GST. Each pipe segment has been filled with water and will undergo a 24-hr. static leakage test.
Hays Caldwell Improvements Phase 2 The GC is currently installing the ductile iron pipe at the east end of the electrical and mechanical building. The building subcontractor will be erecting scaffolding and working on roof finishing and waterproofing for the next 4 weeks.