Hays Caldwell Phase 1 Improvements

The inspector was at the Tank Site, and all of the 24-inch piping has been connected to the new penetration fittings (top and bottom sidewall) at the Old GST.  Each pipe segment has been filled with water and will undergo a 24-hr. static leakage test.